
You want the back of the house to be somewhere the family actually uses, not a surface everyone is careful around. That is mostly a question of how the floor is built rather than how it looks on the day it goes down. A polyaspartic build is specified to be lived on: furniture dragged about, bikes crossing it, and people on it all day. Dialed In Epoxy coats patios, walkways and driveways across Mesa. ROC 358358, and we are licensed, bonded and insured.
Call (602) 820-7739The build is what carries that, and it is four layers rather than one. A polyaspartic base goes onto concrete that has been diamond ground, profiled and vacuumed, then the color layer, then two coats of UV stable polyaspartic to close it. Each of those is doing a job. The base is what holds on to the slab, the color is protected between layers instead of sitting exposed on top, and the finishing coats are the part your furniture and your feet actually meet.
You get to decide how it feels underfoot as well. Anti-slip aggregate goes into the topcoat wherever it is specified, so a walkway that catches the sprinklers can be given more grip than a patio you sit out on, and both still clean up with a hose. It is worth walking the space with us and saying how each part gets used, because that is what the specification is built from rather than a single finish laid everywhere. You know your own traffic better than we do. There is more detail in the build that takes daily traffic if you want it.


Most Mesa lots have concrete that arrived in stages, and running one finish across all of it is what makes a yard read as a single space rather than a set of separate slabs. Grinding brings every pour to the same starting point first, so the color goes onto comparable material and comes out even. That is worth having when your yard is a set of pours from three different decades. Joints between the pours are honored rather than covered, which is what lets each slab move on its own as the day heats up and cools off. Call (602) 820-7739 or fill in the quote form and we will look at how you use the space.
Three stages on every exterior concrete coating in Mesa, AZ, and the preparation is what the other two rest on.
We mechanically grind, profile and vacuum the concrete with diamond tooling, which takes off the weathered top layer along with any old sealer. Exterior slabs almost always carry one, and a coating laid over an existing sealer has nothing to bond to. That preparation runs under every interior floor we lay: the four layers of an epoxy floor build, in order.
Cracks, spalled edges and pitted areas are cut out, filled and ground flush. Control joints are honored rather than filled over, so the slab can still move where it was designed to move instead of cracking somewhere new.
Then the system itself: a polyaspartic base, the color layer, and two coats of UV stable polyaspartic over the top, with anti-slip aggregate broadcast in where it was specified. A polyaspartic build goes down in a day, which on a driveway is the difference between one afternoon without the car and a week of it.
If you want to protect your concrete floor from damage, improve safety, and keep your space looking its best, give us a call or fill in our FREE quote form.

Phoenix, Peoria, Scottsdale, Mesa, Gilbert, Tempe, Glendale, Chandler, Queen Creek, Ahwatukee, San Tan Valley, Maricopa, Avondale, Paradise Valley, Tolleson, Wickenburg, Gold Canyon, Goodyear, New River, Prescott, Fountain Hills, Desert Ridge, Sedona, Surprise, Litchfield Park, Cave Creek, Apache Junction, Buckeye and the rest of Arizona.
