
If you have been resealing the same patio every year or two, you already know what that buys you and what it costs in weekends. A coating is a different proposition: it is the finished surface, not a treatment laid over one, so there is no cycle to keep up with. Dialed In Epoxy builds exterior concrete in Maricopa from a polyaspartic base, a color layer and two UV stable coats on top. ROC 358358, and we are licensed, bonded and insured.
Call (602) 820-7739The difference is where the material sits. A sealer soaks into the top of the slab and thins from the day it goes on, which is why it comes round again. A coating is built up on the surface as its own layer, bonded to concrete we have ground back to something sound. What you walk on afterwards is that build, and it is thick enough to be the thing taking the traffic rather than a film protecting what is underneath.
Getting there properly is most of the value. The old sealer has to come off, because nothing bonds reliably through it, and the diamond grind takes it away with the weathered top layer in the same pass. Cracked, spalled and pitted areas get cut out and filled at that stage, and joints are left as joints so the concrete can still move. It is worth doing once and doing it to the slab rather than to the calendar. You can see what the finished surface is closed with on the main exterior page.


A polyaspartic build goes down in a day, which is the part people find hard to believe after living with a reseal weekend. You lose the use of the area while it goes in and you get it back looking finished rather than looking treated. The color is a layer in the build instead of a tint on the surface, so it does not wash out of the edges where water runs off, and the two UV stable coats over it hold their tone in full sun. You get a surface you can leave alone, which is the point of doing it this way rather than doing it again next spring. Call (602) 820-7739 or fill in the quote form and we will look at what is on the slab now.
Three stages on every exterior concrete coating in Maricopa, AZ, and what comes off first decides the other two.
We mechanically grind, profile and vacuum the concrete with diamond tooling, which takes off the weathered top layer along with any old sealer. Exterior slabs almost always carry one, and a coating laid over an existing sealer has nothing to bond to. That preparation runs under every interior floor we lay: the four layers of an epoxy floor build, in order.
Cracks, spalled edges and pitted areas are cut out, filled and ground flush. Control joints are honored rather than filled over, so the slab can still move where it was designed to move instead of cracking somewhere new.
Then the system itself: a polyaspartic base, the color layer, and two coats of UV stable polyaspartic over the top, with anti-slip aggregate broadcast in where it was specified. A polyaspartic build goes down in a day, which on a driveway is the difference between one afternoon without the car and a week of it.
If you want to protect your concrete floor from damage, improve safety, and keep your space looking its best, give us a call or fill in our FREE quote form.

Phoenix, Peoria, Scottsdale, Mesa, Gilbert, Tempe, Glendale, Chandler, Queen Creek, Ahwatukee, San Tan Valley, Maricopa, Avondale, Paradise Valley, Tolleson, Wickenburg, Gold Canyon, Goodyear, New River, Prescott, Fountain Hills, Desert Ridge, Sedona, Surprise, Litchfield Park, Cave Creek, Apache Junction, Buckeye and the rest of Arizona.
